Fix the organisation you have — one component at a time.
Most improvement programmes die in a side document: a current-state deck nobody updates, a wish list nobody owns, and a plan that lives in a spreadsheet next to the model instead of inside it. Orgith puts today, the gap and the route on the page where the work is described, and then rolls all of them up onto one board.
Nothing here requires a decision about agents. The agentic case is one of the things the gap can argue for — not a precondition for starting.
What is true right now, written where the work is.
Thirty-three prose pages across Organization, Value Streams, Operating Model and Technology each open on a Current tab. It is typed by hand — the AI does not write your present. It may be left empty, so a component nobody has surveyed yet is visibly blank rather than quietly guessed at.
Internal Pressure closes by naming where an internal strain compounds a known external force — the pairs that turn two manageable problems into one urgent one.
- Value Stream Swimlane draws every stream across the departments that perform it. Departments are lanes; a step's sideways position comes from who does it, never from where it sits in the sequence — so a handover is an arrow crossing a lane boundary, and a backward arrow is a real rework loop. The lanes are not reordered to hide it.
- Analyse Department Processes opens every department-owned process as a card and records eight things about it: the trigger, the outcome and who receives it, the systems people actually work in, the bottlenecks and rework loops, the decisions that still need a human and on what basis, concrete AI opportunities named per step, volume and frequency, and the accountable role.
- External and Internal Pressure read the forces rather than the position. Every pressure carries its evidence, an intensity of High, Medium or Low, a horizon of Now, one-to-two years or three-to-five, and the one thing it forces you to do — closing with the cost of ignoring the five strongest for another year.
- Headcount per department and average annual cost per employee are typed figures on the department and the role, not numbers parsed out of generated prose. A department left empty takes the sum of the roles under it, so the two views cannot drift apart.
The gap, per component — not one verdict on the whole organisation.
The Delta tab compares your Current against New, the target the platform writes for that same page, and needs both to say anything. A gap on the Application Landscape reads nothing like a gap on Mission, which is exactly why the comparison sits per page instead of once per organisation.
- Delta is generated from the two texts in front of it, so it moves when either side moves. Correct the Current and the gap changes with it.
- Process Impact turns the same comparison into a number you can act on: agent-run processes with no AI opportunity written down yet — work the target hands to agents with nothing recorded about how.
- The pressure ranking supplies the order. A wide gap under low pressure is not the first thing you fix, and the two pages together say which is which.
- The page documents sidebar, the page instructions box and the refine box render on all four tabs and act on the tab in front of you — refining while reading Delta refines Delta.
- Current
- typed by hand · may be left empty
- Track A writes this
- New
- the target · generated · sign-off status
- Track B is built on this
- Delta
- needs both
- where the two meet
- Plan
- three horizons · needs the target
- Track A executes this
Three horizons, risks and dependencies — on the page itself.
The Plan tab sets out the route from Current to New in three horizons — the first ninety days, the rest of year one, and beyond year one — and closes with the risks and dependencies that route carries. It needs the target to exist, because a route without a destination is a wish list.
- Ninety days first, on purpose: the horizon a sponsor can still hold someone to, and the one that decides whether the programme survives its first quarter.
- The plan is prose you can edit, regenerate, or refine with an instruction — the same controls as every other page, acting on the Plan tab.
- OKRs cascade company objectives to every department, each department objective tracing to exactly one company objective — so no plan carries an objective with nothing above it.
Ownership lands where the content lives.
A component's plan sits on that component's page, beside the text it is about. There is no second place where it also lives and slowly diverges. Each target carries a status of Not started, In progress or Final, with a Mark as final control beside it.
- Sign-off is computed, not stored as a flag: the status is worked out on every read by hashing the live text and comparing it against the hash captured at sign-off. An edit made after sign-off drops the badge back to In progress instead of leaving Final standing over content that has since changed.
- Named menu views give each stakeholder their own surface — a board member, a department head and an external consultant see the pages that concern them, saved once under a name and assigned rather than rebuilt per person.
- Permissions resolve in three layers — base role, then the view, then the user's own overrides, which still win — merged per field, and the server enforces the same map, so a hidden control is not merely hidden.
Every plan on one board.
Thirty-three plans on thirty-three pages answer a component question well and a programme question not at all: what are we doing, in what order, and how far have we got. Growth → Roadmap is that board — every page whose Plan tab holds content, with a priority, a status and an order you set yourself.
Owners, dates, effort and sub-steps are not in this version. The board answers order and progress; it is not a project-management tool pretending to be one.
- The rows are not stored. They are computed on every read from the saved plans, so clearing a plan removes its row with no sync step — and there is no state in which the board can claim a plan that a page does not have.
- The board's own table holds only the tracking — status, priority, position — and a row is written the first time one of those changes. Opening the board writes nothing at all.
- Regenerating a plan keeps its row exactly as it was: the tracking belongs to the page, not to a particular revision of the text.
- The plan text cannot be edited on the board, deliberately. It belongs to the page's own Plan tab, which already carries the refine box and the regenerate button — two editors over one string is how the two come apart.
| Page | Priority | Status |
|---|---|---|
| Value Streams → Analyse Value Streams | High | In progress |
| Technology → Application Landscape | High | In progress |
| Operating Model → OKRs | High | Done |
| Organization → Company Profile | Medium | Done |
| Departments → Department Processes | Medium | Not started |
| Technology → Data Architecture | Low | Not started |
A finished Current state is a simulation waiting to be run.
The improvement track fills in what the organisation is. That is exactly the baseline the simulation track needs — headcount, processes, value streams, cost. Nothing has to be re-entered: mark a copy as a simulation and the agentic case is computed from the work you already did.
See Role Assessor in action.
Book a demo with Wiemer — one conversation is enough to see whether it fits your organisation.